
Certified pressure.
Documented proof.
We tear down pressurized chambers to the gasket, recalibrate to ASME tolerances, and return autoclaves running quieter than the day they shipped — with validation reports that survive any audit.
Every failure mode.
One number to call.
Preventive Maintenance
Full disassembly inspection, gasket and door seal replacement, heating element calibration, and documented cycle log review. Keeps your autoclave inside OSHA and CDC sterilization guidelines.
- Gasket, door seal & O-ring replacement
- Pressure transducer calibration ±0.5 PSI
- Chamber descaling & ultrasonic cleaning
- Heating element & thermostat verification
- Biological indicator testing (Class 5 CI)
- PM completion certificate issued same-day
Emergency Repair
When a flash cycle runs long or a chamber fails to reach temperature, every minute counts. We dispatch a certified technician within four hours — parts van stocked for Tuttnauer, Midmark, Ritter, Pelton & Crane, and Getinge.
- Error code diagnosis & root-cause report
- Same-day valve, pump & sensor replacement
- Post-repair validation cycle documented
- Loaner unit coordination if >24hr repair
Validation Testing
Installation Qualification, Operational Qualification, and Performance Qualification packages that satisfy FDA 21 CFR Part 11, ISO 17665, and AAMI ST79 requirements. Reports formatted for immediate audit submission.
- Bowie-Dick & vacuum leak testing
- Temperature mapping (11-point probe array)
- Load configuration documentation
- Parametric release data export (CSV/PDF)
- FDA 483 response-ready report format
- Annual re-validation scheduling included
We know your
exact machine.
Five OEM lines. Model-specific tooling and firmware. Parts van stocked before we knock on your door.
Tuttnauer
Midmark
Ritter
Pelton & Crane
Getinge
The paper trail
that proves it.
Every certification active, every standard current. Click any document to preview — the same files your auditor will see.

ASME Boiler & Pressure Vessel Certification
Section VIII Division 1 compliance for pressure vessel inspection and recertification.

FDA 21 CFR Part 11 Compliance Audit
Electronic records and signatures compliance for pharmaceutical and surgical validation documentation.

ISO 17665-1 Moist Heat Sterilization
Moist heat sterilization of healthcare products — process development, validation, and routine control.

AAMI ST79 Comprehensive Guide Compliance
Comprehensive guide to steam sterilization and sterility assurance in healthcare facilities.
"Our Midmark M11 was throwing E004 errors mid-cycle. Sterilize had a tech on-site in under three hours, replaced the solenoid valve, ran a full validation cycle, and handed us documentation before our afternoon patient load. That report is still in our infection-control binder."

"We manage 44 autoclaves across six surgical suites. Sterilize built us a PM schedule tied to cycle counts, not calendar dates. Our next Joint Commission survey went cleaner than any we've had in eight years."

"The IQ/OQ/PQ package they delivered for our new Getinge line was formatted exactly as our QA team needed — parametric release data, load configurations, everything. Zero back-and-forth with the auditor."

57 techs across
6 service regions.
Parts vans stocked before dispatch. If we can't reach you in the guaranteed window, the service call is on us.
Great Lakes
Northeast Corridor
Mid-Atlantic
Southeast
Southwest
West Coast
Don't see your region? We're expanding. Describe your situation and we'll route the nearest certified technician.
Tell us your machine.
We'll know what to bring.
Manufacturer and model first — so the technician arrives with the right parts, not a question.
24-point preventive maintenance checklist formatted for Tuttnauer, Midmark, and Getinge. Used by 840+ practices.